RECENTLY COMPLETED PROJECTS

Gripple Sheffield

image41

Gripple

Market leaders Gripple and loadhog were looking to enhance their lighting levels in their workshop and engineering areas whilst dramatically reducing their energy costs. GME Industry installed a state of the art LED lighting system to replace their old inefficient metal halide lighting.

Case study overview

-  2 year payback

-  65% energy/maintenance saving

-  156 tonnes of co2e saved each year

-  468% 10 year ROI

Northumbria University - CBRE

image42

 CBRE 

Northumbria University, a key client of CBRE were looking to enhance their lighting levels in all communal/break out areas of their flagship building CCE1, whilst dramatically reducing their energy costs. GME Industry installed a state of the art LED lighting system to replace their old inefficient lighting.

Case study overview

-  2000+ lights installed during 5 week program

-  50% energy/maintenance saving

-  132 tonnes of co2e saved each year

-  £32k+ per year saving on energy bill

BEL Valves

image43

Bel Valves

GME Industry were commissioned to undertake the annual 3 hour emergency lighting test across all 3 sites at their St Peters basin headquarters.

Case study overview

-  200+ emergency lights tested for 3 hour duration

-  Test results recorded on test schedule

-  Repairs and remedial works completed to all failed fittings

-  Satisfactory certification issued upon completion keeping Bel Valves compliant with their electrical safety responsibilities

Stadium Export Services

image44

Stadium Export Services

GME Industry were commissioned to undertake the 3 yearly fixed wire test and inspection (Periodic) across all 3 workshop bays at their Swalwell site.

Case study overview

-  20+ distribution boards with 200+ circuits

-  Inspection and testing completed with 1 week

-  100% of circuits tested

-  All remedial works required to rectify code 1’s and 2’s undertaken

-  Satisfactory certificates issued on completion to keep Stadium Export compliant with their electrical safety requirements

De La Rue - team valley

image45

De La Rue

GME Industry has worked with De La Rue for over 7 years on industrial installations to support the electrical requirements for their machines. Our most recent project included;

Case study overview

-  Installation of 300a iLine section board

-  600mm ladder rack installation

-  185mm armoured cable installation

-  All work fully tested and certified to current regs

NHS Property Services

image46

NHS Property Services

GME Industry recently won the tender to replace the old bus bar distribution arrangement supplying a health centre.

-  Strip out and remove all the old bus bar chamber, isolators, tails etc

-  Install new Merlin Powerpact panel board

-  Install new armoured cable to feed all outgoing ways, Install new main isolator, change over switch and main meter.

-  Install sub metering to all outgoing ways

-  All works completed over night shift and weekend working to avoid any disruption to the standard hours of the health centre.

-  All works completed within 7 days

More to come soon